At Holt Renewables in Fresno, CA, 22 bollards were installed to protect key areas and improve site safety. The project started with a careful layout to ensure proper spacing and alignment, followed by precise drilling and preparation for each footing.
Each bollard was set securely, leveled, and anchored with concrete for long-term durability. Protective covers were added to complete the installation, leaving the site clean, organized, and ready for daily operations.
Locations
Fresno, CA
Client
HOLT Renewables